Excavation to Break out Reinforced Concrete floor – Newmarket

Project in brief

Date: January 2018
Duration: 2 days.
Client: Studlands Park Industrial Estate

Description of Work

– Cut existing factory floor to break out area, and pour base for new floor pit.
– Break out the reinforced concrete floor.
– Pour new concrete base to floor pit at a lower level.
– Work by Finch Services Ltd.